Skip to content

100,000 Sq. Ft. New Construction

Project: Industrial Clear Coat in Manufacturing Space

Client: Elringklinger

Area: 100,000 Square Feet

Location: San Antonio, TX

Date: July 2022

Description: Elringklinger is a manufacturer of auto parts for other major automotive manufacturers. In 2022, they opened a new manufacturing plant in San Antonio, TX and needed to protect their concrete floors from everything from high degree process temperatures and hot tire pickup to harsh industrial chemicals and forklift battery acid leaks. Premera T2 MCM was the only and entire system they used to handle all of these harsh wear factors. The client is very pleased with the result, and will use Premera T2 MCM for future manufacturing operations.

System: Premera T2 MCM